The data is recorded. The reports are ready.
Survey. Readings. Machines. Visits. Drawing. Three reports come out of it, each a PDF with your logo. They are ready the moment you ask for them.
- Leak detection report with methods, the location and photos
- Drying report with readings, equipment and days deployed
- Floorplan with rooms, dimensions and areas as its own PDF
30-day money-back guarantee. No credit card.
Musterstraße 5, Berlin
Recorded once on site. Reported three ways.
The completed survey, the readings at each measuring point, the machines deployed, the drawing of the floor: it all sits on the project. A report turns it into the document for the insurer, the loss adjuster or the owner.
Searched on site. Found in the report.
The search is recorded on the tablet as a form. The report gives it back in the same order. Reason and affected system. Methods and their values. The location with room, component, offset from a reference point and depth. Whoever opens the wall opens the right spot. The same holds for every completed form: questions, answers and photos.
- Reason for the search
- Moisture with no visible source
- System affected
- Underfloor heating
- Carried out by
- M. Weber
- Methods used
-
Thermography Moisture readings Tracer gas
- Thermography: finding
- A warm run crossing under the screed, escaping where it meets the wall.
- Leak located?
- Yes, located
- Location: room
- Bathroom, ground floor
- Location: component
- Floor
- Offset from reference
- 80 cm from the left corner, 30 cm above finished floor
- Location: depth
- 6 cm
- Type of defect
- Joint / fitting
Every visit in the report. Every machine with its days.
Measuring points and their values across every visit. Machines with days deployed and consumption. Photos on the readings. That is the evidence of how the drying ran and how long it took, which the insurer wants to see. Every documented day is a day you can bill.
A PDF of its own. For whoever builds on.
Rooms, dimensions and areas come as a scaled plan, separate from the drying report. The drawing goes to the loss adjuster or the reinstatement team. The rebuild carries on from your measurements.
Three templates to choose from. Each carries your logo.
Set your logo, house colour and company details once in the settings. Every report picks them up, in one of three templates. Download the PDF or have it sent to you, and pass it on. A report that looks like work gets paid like work.
See it on a job of your own.
A short call where we walk through your actual workflow and show what it looks like in Krahasso.
Hosted in Germany
Servers and backups sit in German data centres. Processing under Art. 28 GDPR, with the DPA included.
E-invoicing to EN 16931
With the Commerce module: every invoice as XRechnung or ZUGFeRD, mandatory fields checked before it goes out.
Backed up daily
Backups at a second German data-centre site, kept for 31 days.
Your data stays yours
Projects, receipts and documents export to file whenever you want, including on your way to someone else.
More in Closeout
- Signatory
- B. Bauer (client)
- Signed at
- 28.09.2026, 16:12
- Checksum
- sha256:4f2a9c… e81d
Signature & handover
Have the project confirmation and your own documents signed on the device. With the time, the signatory and a checksum of the PDF, verifiable from the office.
- Supplier
- Baustoffe Meyer GmbH
- Date
- 14.09.2026
- Net
- 842,02 €
- VAT 19 %
- 159,98 €
Receipts, tax & DATEV
Have receipts read out. Figures for UStVA, EÜR and the EC Sales List. Hand a period over as a DATEV posting batch.
Your first job. Set up together.
We set up your warehouse and your first project with you. On the call we work out which modules fit your business. Every number that is right on site is right in the report.
30-day money-back guarantee. No credit card.