Software for structural drying

Every unit in view. On every site.

Dryers, dehumidifiers, fans and their accessories: Krahasso knows where each unit is, since when and at what meter reading. Before you commit to a job, you see what is free.

  • Your whole fleet by model, accessories fixed to the unit
  • Allocation and return with meter readings, without paper
  • Check availability before you commit to the job

30 days free. No bank details.

Check-out P-2041
3 machines in one operation
Musterstraße 5, 10115 Berlin
  • Trotec TTK 125 S
    DH-014
    142 kWh
    checked
  • Aerial AD 660
    DH-027
    218 kWh
    checked
  • Drymatic Boost
    FAN-088
    67 kWh
    checked
Handover M. Schneider T. Fischer · 16.09.2026, 07:42

How a drying job runs in Krahasso.

  1. 1

    Set up the fleet

    We import your units, models and accessories with you by CSV. After that, search finds every unit.

  2. 2

    Allocate

    Book the unit onto the project, record the meter reading, accessories go with it. The live map shows where it is.

  3. 3

    Measure

    Fixed measuring points, visit by visit. Every visit backed by readings and photos in the log.

  4. 4

    Return

    Return with a meter reading, the power consumption lands in the report. The unit is free again straight away.

Key figures

What your fleet is doing right now. In figures.

How many units are out, how many are free, and what is available on a given day. Plus the run time and consumption of every unit, documented for billing.

krahasso.com/equipment
Equipment fleet
218 units
Munich warehouse
+ Allocate
Deployed
142
Available
68
Service
6
Idle
2
DH-014 Deployed
Trotec TTK 125 S
Musterstr. 5, Berlin
142 kWh
DH-027 Deployed
Aerial AD 660
Lindenweg 12, Bonn
218 kWh
FAN-088 Returning
Drymatic Boost
Hauptstr. 3, Hamburg
67 kWh
DH-031 Available
Trotec TTK 125 S
(available)
0 kWh
HEAT-04 Deployed
Master B 35 CED
Bahnhofstr. 8, Köln
54 kWh
In use and available
Your fleet by model, with what is out on site right now and what is in the warehouse.
Available on the start date
Plan the job as a draft with models and quantities. Reservations for other projects are taken into account. If a model runs short, you hear about it days ahead, by email and in the app.
Meter reading, checked
At allocation and return, Krahasso checks against the last known value and flags what cannot be right. At that moment someone is still standing at the unit.
Run time and consumption
Per unit and deployment, totalled in the project report. Every documented run time can be billed cleanly.
Condition on return
Free again or under repair. Dispatch only plans with what is really in the warehouse.

The features for Structural drying

Every feature has its own page, with everything it can do.

See every feature
krahasso.com/equipment
Equipment fleet
218 units
Munich warehouse
+ Allocate
Deployed
142
Available
68
Service
6
Idle
2
DH-014 Deployed
Trotec TTK 125 S
Musterstr. 5, Berlin
142 kWh
DH-027 Deployed
Aerial AD 660
Lindenweg 12, Bonn
218 kWh
FAN-088 Returning
Drymatic Boost
Hauptstr. 3, Hamburg
67 kWh
DH-031 Available
Trotec TTK 125 S
(available)
0 kWh
HEAT-04 Deployed
Master B 35 CED
Bahnhofstr. 8, Köln
54 kWh

Equipment inventory

Dehumidifier. Fan. Heater. Every machine with serial number, model and status, searchable across the whole stock.

Check-out P-2041
3 machines in one operation
Musterstraße 5, 10115 Berlin
  • Trotec TTK 125 S
    DH-014
    142 kWh
    checked
  • Aerial AD 660
    DH-027
    218 kWh
    checked
  • Drymatic Boost
    FAN-088
    67 kWh
    checked
Handover M. Schneider T. Fischer · 16.09.2026, 07:42

Check-out & return

Several machines out and back in one go. Meter readings checked, every handover on record.

Drying logs
7 active logs
  • Musterstraße 5, 10115 Berlin
    P-2041 · day 12
    1 day ago
  • Lindenweg 12, 53111 Bonn
    P-2038 · day 19
    2 days ago
  • Hauptstraße 3, 20095 Hamburg
    P-2035 · day 24
    2 days ago
  • Bahnhofstraße 8, 50667 Köln
    P-2031 · day 31
    4 days ago
  • Ahornweg 21, 40213 Düsseldorf
    P-2028 · day 38
    6 days ago

Drying logs

Measuring points. Readings across every visit. Photo evidence. The power each deployment drew.

Live map

Live map

Every active project and machine on one map, overdue projects in red. Click a marker, read the detail.

Analytics
Q3 2026
Utilisation
74 %
in period
Avg drying time
18
days
Completion rate
94 %
in period
Overdue
3
projects
Utilisation by category
  • Dehumidifiers
    82 %
  • Fans
    61 %
  • Heaters
    48 %

Analytics

Utilisation and idle days for your machines. Drying duration and overdue projects. Over the period you choose. The commerce module adds the finances.

Drying protocol
Drying report
Musterstraße 5, Berlin
P-2041
14.05.2026
Client
Beispiel Versicherung AG
Claim #BV-2026-04417
Restorer
Trocknungs GmbH
Berlin, DE
Equipment deployed
DH-014
Trotec TTK 125 S
12 days
142 kWh
DH-027
Aerial AD 660
12 days
218 kWh
FAN-088
Drymatic Boost
8 days
67 kWh
Readings per visit: MP-1 Wall A
Visit 1
28.04.2026
86 → 82
Digits
Visit 2
05.05.2026
82 → 71
Digits
Visit 3
12.05.2026
71 → 62
Digits
Photographic evidence
Created on 14.05.2026
Page 1 / 6

Reports

Leak detection. Drying. Floorplan. Three reports as PDFs, from the data already in the project.

Hosted in Germany

Servers and backups sit in German data centres. Processing under Art. 28 GDPR, with the DPA included.

E-invoicing to EN 16931

With the Commerce module: every invoice as XRechnung or ZUGFeRD, mandatory fields checked before it goes out.

Backed up daily

Backups at a second German data-centre site, kept for 31 days.

Your data stays yours

Reports, receipts and documents download as files whenever you want. On request we hand over your complete data, including when you move on.

Get started

Pick your plan. Get to work.

30 days free. No bank details.